Highway Barrier Hardware Guide Discussion Board
« Home »

Welcome Guest. Please Login or Register.
Jul 5, 2008, 12:34pm





Highway Barrier Hardware Guide Discussion Board :: Home
Forum NameTopicsPostsLast Post
Errors and Omissions
[ ]Errors and Suggested Changes - 2 Viewing
Reports and discussions of errors, omissions, clarifications, and suggested changes to the current Guide
Moderator: Administrator
5469on Sept 30, 2005, 11:24am
by Administrator
in SEW18a-b - SKT-MGS
New Hardware Submissions - Guardrails / Median Barriers
[ ]SGM07 (1 sub-board)
High tension cable median barriers
Moderator: Administrator
11on Oct 5, 2005, 10:54am
by Administrator
in In progress
[ ]SGM09a-b
Strong-Post Thrie-Beam Median Barrier
Moderator: Administrator
12on Apr 28, 2008, 2:48pm
by Karla Polivka
in New drawing & spec
[ ]SGM09c
Modified Thrie-Beam Median Barrier
Moderator: Administrator
12on Apr 28, 2008, 2:50pm
by Karla Polivka
in New drawing & spec
[ ]SGR05
Culvert-Mounted W-Beam Guardrail
Moderator: Administrator
18on May 8, 2007, 2:00pm
by Karla Polivka
in Drawing/spec
[ ]SGR07
High-tension cable guardrails
Moderator: Administrator
34on Oct 10, 2006, 11:44am
by cheimbecker
in SGR07e - Nucor U.S. Hi...
[ ]SGR08
Timber guardrails
Moderator: Administrator
11on May 18, 2005, 10:02am
by Administrator
in SGR08a - Ironwood
[ ]SGR09a-b
Strong-Post Thrie-Beam Guardrail
Moderator: Administrator
18on Apr 28, 2008, 2:53pm
by Karla Polivka
in New drawing
[ ]SGR09c
Modified Thrie-Beam Guardrail
Moderator: Administrator
13on Apr 28, 2008, 2:55pm
by Karla Polivka
in New drawing
[ ]SGR20a-b
Midwest Guardrail System
6'-3" Post Spacing
24on May 17, 2007, 11:12am
by Administrator
in New Drawing Posted
[ ]SGR21a-b
Midwest Guardrail System
3'-1 1/2" Post Spacing
23on May 17, 2007, 11:15am
by Administrator
in New Drawing Posted
[ ]SGR22a-b
Midwest Guardrail System
1'-6 3/4" Post Spacing
24on May 17, 2007, 11:15am
by Administrator
in New Drawing Posted
[ ]SGR23a-b
Midwest Guardrail System with Curb
6'-3" Post Spacing
23on May 17, 2007, 11:16am
by Administrator
in New Drawing Posted
[ ]SGR24a-b
REDUCED SPACING, STRONG-POST, W-BEAM GUARDRAIL ON A SLOPE
11on Aug 31, 2007, 10:22am
by Administrator
in New Drawing Posted
[ ]SGR25
REDUCED SPACING, W-BEAM GUARDRAIL ON CONCRETE BOX CULVERT
11on Aug 31, 2007, 10:23am
by Administrator
in New Drawing Posted
[ ]SGR26
NESTED, STRONG-POST, W-BEAM GUARDRAIL WITH 4"[102] CURB
11on Aug 31, 2007, 10:31am
by Administrator
in New Drawing Posted
[ ]SGR27 - 1 Viewing
STRONG-POST, W-BEAM GUARDRAIL SYSTEM WITH POST PLACED IN ROCK
425on Jun 29, 2008, 4:29am
by ewfew
in New Drawing Posted
New Hardware Submissions - Crash Cushions
[ ]SCI09
ADIEM (updated)
Moderator: Administrator
11on Apr 21, 2005, 7:39pm
by Administrator
in In progress
[ ]SCI13a-b
BEAT-SSCC (Single Sided Crash Cushion)
Moderator: Administrator
25on Oct 27, 2005, 5:10pm
by Administrator
in Drawing/spec
[ ]SCI14
CushionWall II
Moderator: Administrator
12on Oct 27, 2005, 5:13pm
by Administrator
in New Drawing
[ ]SCI18a-b
TRACC and WideTRACC
Moderator: Administrator
11on Apr 21, 2005, 7:43pm
by Administrator
in In progress
[ ]SCI19
StopGate
Moderator: Administrator
12on May 23, 2005, 4:50pm
by Greg Speier
in Drawing
New Hardware Submissions - Terminals
[ ]SEB03
WY-BET (updated)
Moderator: Administrator
11on Apr 21, 2005, 7:45pm
by Administrator
in In progress
[ ]SEC07
Terminals for high-tension cable systems
Moderator: Administrator
11on May 18, 2005, 10:06am
by Administrator
in SEC07a - CASS end trea...
[ ]SET03
THRIE-BEAM BULLNOSE END TERMINAL
11on Sept 7, 2007, 10:24am
by Administrator
in New Drawing Posted
[ ]SEW05
MELT
Moderator: Administrator
11on May 9, 2005, 11:05am
by Administrator
in Old comment
[ ]SEW07
ET-PLUS (updated ET)
Moderator: Administrator
11on Apr 21, 2005, 7:50pm
by Administrator
in In progress
[ ]SEW08
CAT 350
Moderator: Administrator
11on Apr 21, 2005, 7:51pm
by Administrator
in In progress
[ ]SEW12
SRT 350
Moderator: Administrator
11on Apr 21, 2005, 7:51pm
by Administrator
in In progress
New Hardware Submissions - Work Zone
[ ]SWC02a-b
J-J Hooks Positive Connecting Barrier
Moderator: Administrator
16on Apr 28, 2008, 4:02pm
by Karla Polivka
in Drawing/spec
[ ]SWC09
TEMPORARY F-SHAPE CONCRETE BARRIER ELEMENT
12on May 1, 2008, 10:27am
by jamiekendall
in New Drawing Posted
[ ]SWC10
TIE-DOWN STRAP SYSTEM FOR F-SHAPE CONCRETE BARRIER
12on May 1, 2008, 10:27am
by jamiekendall
in New Drawing Posted
[ ]SWC11
BOLTED-DOWN TEMPORARY F-SHAPE CONCRETE BARRIER
11on Sept 7, 2007, 10:27am
by Administrator
in New Drawing Posted
[ ]SWC12
DRIVEN PINS THROUGH ASPHALT FOR F-SHAPE CONCRETE BARRIERS
11on Sept 7, 2007, 10:27am
by Administrator
in New Drawing Posted
[ ]SWM03a-b - 1 Viewing
Triton Barrier TL-3 & TL-2
Moderator: Administrator
14on Apr 28, 2008, 4:08pm
by Karla Polivka
in Drawing
[ ]SWM04
Vulcan Barrier
Moderator: Administrator
12on Apr 11, 2008, 12:29pm
by bstephens
in In progress
[ ]SWM08
FREE-STANDING, H-PILE, STEEL TEMPORARY BARRIER SYSTEM
14on Apr 29, 2008, 9:35am
by takachr1
in New Drawing Posted
[ ]SWM09
BOLTED-DOWN, H-PILE, STEEL TEMPORARY BARRIER SYSTEM
14on Apr 29, 2008, 9:37am
by takachr1
in New Drawing Posted
New Hardware Submissions - Components
[ ]FBB08-09
ROUND HEAD BOLT WITH WASHER AND HEX NUT
11on Oct 2, 2007, 9:56am
by Administrator
in New Drawing
[ ]FMW02
TEMPORARY BARRIER CONNECTOR PIN
14on Jun 25, 2008, 10:23pm
by sfe
in New Drawing
[ ]FMW03
TEMPORARY BARRIER CONNECTOR PIN WITH RETAINING BOLT
11on Oct 2, 2007, 9:57am
by Administrator
in New Drawing
[ ]PDB09
MGS 8" Timber Blockout for Built-Up 12" Block for Steel Post
11on May 17, 2007, 9:50am
by Karla Polivka
in Drawing
[ ]PDB10a-b
MGS 12" Timber Blockout For Steel Post
11on May 17, 2007, 9:40am
by Karla Polivka
in Drawing
[ ]PDB11a-b
MGS 12" Timber Blockout for Timber Post
11on May 17, 2007, 9:42am
by Karla Polivka
in Drawing
[ ]PDB12
W-BEAM TAPERED TIMBER BLOCKOUT FOR TIMBER GUARDRAIL POST
11on Oct 2, 2007, 9:58am
by Administrator
in New Drawing
[ ]PDB13a-f
MGS BLOCKOUTS FOR MGS ROUND POST APPLICATIONS
11on Oct 2, 2007, 9:58am
by Administrator
in New Drawing
[ ]PDB16
CRT TIMBER POST FOR THRIE-BEAM GUARDRAIL
11on Oct 2, 2007, 9:59am
by Administrator
in New Drawing
[ ]PDE17a-c
ROUND POST FOR MGS GUARDRAIL SYSTEM
14on Jun 26, 2008, 2:35am
by sfe
in New Drawing
[ ]PDF04
BCT TIMBER POST FOR THRIE-BEAM BULLNOSE END TERMINAL
47on Jun 29, 2008, 3:55am
by fewfew
in Looking to buy WOW Gold
[ ]PTE06-07
MGS AND THRIE BEAM FOUNDATION TUBES
46on Jun 29, 2008, 1:15am
by fewfwe
in Looking to buy WOW Gold
[ ]PWE06-07
6' & 7' Steel Post for MGS
00
[ ]RTM07a-c
SLOTTED AND BENT THRIE BEAM GUARDRAIL
11on Oct 2, 2007, 10:00am
by Administrator
in New Drawing
New Hardware Submissions - Longitudinal
[ ]LPBR
LOW-PROFILE, CONCRETE BARRIER
11on Sept 7, 2007, 10:28am
by Administrator
in New Drawing Posted
[ ]SDC01
THREE CABLE TRANSITION TO BCT END TERMINAL
11on Sept 7, 2007, 10:29am
by Administrator
in New Drawing Posted
[ ]SGR28
MGS GUARDRAIL SYSTEM FOR USE WITH ROUND POSTS
11on Sept 7, 2007, 10:29am
by Administrator
in New Drawing Posted
[ ]SGR29
300"[7620] LONG-SPAN, W-BEAM WITH 1,200"[30480] NESTED RAIL
11on Sept 7, 2007, 10:30am
by Administrator
in New Drawing Posted
[ ]SGR30
TIMBER GUARDRAIL SYSTEM FOR ATTACHMENT TO NOISE WALL
49on Jun 13, 2008, 6:46am
by Alex
in Looking to buy WOW Gold
Archives
[ ]SCI06a-c
Sand barrels (Traffix, Fitch, and Energite III)
Moderator: Administrator
34on Sept 30, 2005, 10:46am
by Administrator
in System approval
[ ]SCI10
NEAT (updated)
Moderator: Administrator
25on Sept 30, 2005, 10:47am
by Administrator
in System approval
[ ]SCI11
ABSORB 350
Moderator: Administrator
22on Sept 30, 2005, 10:47am
by Administrator
in System approval
[ ]SCI12
BEAT-BP (bridge pier protection system)
Moderator: Administrator
34on Sept 30, 2005, 10:52am
by Administrator
in System approval
[ ]SCI15
EASI-Cell Cluster
Moderator: Administrator
22on Sept 30, 2005, 10:53am
by Administrator
in System approval
[ ]SCI16a-b
REACT 350 & REACT 350 Wide
Moderator: Administrator
22on Sept 30, 2005, 10:55am
by Administrator
in System approval
[ ]SCI17a-b
SCI100GM and SCI70GM
Moderator: Administrator
24on Sept 30, 2005, 10:55am
by Administrator
in System approval
[ ]SCT01a-b
TAU II and Universal TAU II
Moderator: Administrator
24on Sept 30, 2005, 10:56am
by Administrator
in System approval
[ ]SCT02a-h
QuadGuard Family: Quadguard, CZ, CZ on plate, High Speed, Elite, LMC, CEN, & 69/90
Moderator: Administrator
22on Sept 30, 2005, 10:56am
by Administrator
in System approval
[ ]SEB05
BEAT (roadside box beam terminal)
Moderator: Administrator
33on Sept 30, 2005, 10:58am
by Administrator
in System approval
[ ]SEB06
BEAT-MT (median box beam terminal)
Moderator: Administrator
33on Sept 30, 2005, 11:03am
by Administrator
in System approval
[ ]SEC01
Cable Guardrail Anchor
Moderator: Administrator
25on Sept 30, 2005, 11:07am
by Administrator
in System approval
[ ]SER02
Triton Barrier CET (end treatment for PCMB)
Moderator: Administrator
24on Sept 30, 2005, 11:08am
by Administrator
in System approval
[ ]SET02
Quadtrend 350
Moderator: Administrator
24on Sept 30, 2005, 11:08am
by Administrator
in System approval
[ ]SEW06
Brakemaster 350
Moderator: Administrator
24on Sept 30, 2005, 11:09am
by Administrator
in System approval
[ ]SEW14a-b
FLEAT (TL-3 & TL-2)
Moderator: Administrator
34on Sept 30, 2005, 11:04am
by Administrator
in System approval
[ ]SEW15
FLEAT-MGS (Midwest Guardrail System)
Moderator: Administrator
33on Sept 30, 2005, 11:04am
by Administrator
in System approval
[ ]SEW16
FLEAT-MT (median W-beam terminal)
Moderator: Administrator
33on Sept 30, 2005, 11:05am
by Administrator
in System approval
[ ]SEW17a-c
SKT (TL-3, TL-2, & LITE)
Moderator: Administrator
33on Sept 30, 2005, 11:05am
by Administrator
in System approval
[ ]SEW18a-b
SKT-MGS & SKT-LITE-MGS
Moderator: Administrator
33on Sept 30, 2005, 11:06am
by Administrator
in System approval
[ ]SGM01
Cable median barrier
Moderator: Administrator
29on Sept 30, 2005, 10:17am
by Administrator
in System approval
[ ]SGM02
Weak-Post W-Beam Median Barrier
Moderator: Administrator
26on Sept 30, 2005, 10:19am
by Administrator
in System approval
[ ]SGM03
Weak-Post Box-Beam Median Barrier
Moderator: Administrator
25on Sept 30, 2005, 10:19am
by Administrator
in System approval
[ ]SGM04a-b
Strong-Post W-Beam Median Barrier
Moderator: Administrator
22on Sept 30, 2005, 10:20am
by Administrator
in System approval
[ ]SGM06a-b
Strong-Post Median Barrier with Rubrail
Moderator: Administrator
25on Sept 30, 2005, 10:21am
by Administrator
in System approval
[ ]SGM10a-b
F-Shape Median Barrier
Moderator: Administrator
37on Sept 30, 2005, 10:22am
by Administrator
in System approval
[ ]SGM11a-b
Safety-Shape Median Barrier
Moderator: Administrator
311on Sept 30, 2005, 10:22am
by Administrator
in System approval
[ ]SGM12
Tall-Wall Median Barrier
Moderator: Administrator
34on Sept 30, 2005, 10:23am
by Administrator
in System approval
[ ]SGM15
Visi-Barrier
Moderator: Administrator
22on Sept 30, 2005, 10:23am
by Administrator
in System approval
[ ]SGM20
BarrierGate (updated)
Moderator: Administrator
24on Sept 30, 2005, 10:24am
by Administrator
in System approval
[ ]SGM22
Reactive Tension Moveable Barrier
Moderator: Administrator
23on Sept 30, 2005, 10:24am
by Administrator
in System approval
[ ]SGM23
SafeGuard Gate
Moderator: Administrator
24on Sept 30, 2005, 10:25am
by Administrator
in System approval
[ ]SGR01a-b
Weak-steel post cable guardrail
Moderator: Administrator
416on Sept 30, 2005, 10:25am
by Administrator
in System approval
[ ]SGR02
Weak-Post W-Beam Guardrail
Moderator: Administrator
29on Sept 30, 2005, 10:26am
by Administrator
in System approval
[ ]SGR03
Weak-Post Box-Beam Guardrail
Moderator: Administrator
22on Sept 30, 2005, 10:26am
by Administrator
in System approval
[ ]SGR04a-b
Strong-post W-beam guardrail
Moderator: Administrator
211on Sept 30, 2005, 10:27am
by Administrator
in System approval
[ ]SGR15
Safe-T-Curve Barrier
Moderator: Administrator
22on Sept 30, 2005, 10:27am
by Administrator
in System approval


Info Center
Forum Statistics
i
Total Topics: 216   -   Total Posts: 397
Last Updated Topic: New Drawing Posted by ewfew (Jun 29, 2008, 4:29am)
View the 10 most recent posts of this forum.